인도네시아 자카르타 근무 상수도 설계 4개월
Raw Water Supply/Pipping
Specialist (International, 4 person-months).
Review the existing raw water supply system from the Saluki
weir to Olobuju
WTPdamaged by the earthquake and
liquefaction
Conduct an inventory of damage to the transmission line in the existing raw water supply system
Prepare a plan
for
repairing the
transmission line
with alternative to change distribution line (JDU) from the New
WTP to the
water reservoir.
Conduct a field survey of the planned transmission line from
the Wuno weir to the existing Olobuju WTP, from Paneki weir, and
other sources
Calculate the
hydraulics of repairing the transmission
line with alternative to change distribution line (JDU) from the New
WTP to the water reservoir, and the transmission line from the
Wuno
weir to the existing Olobuju
WTP, from Paneki weir, and other sources.
Prepare concept design
of transmission line and
distribution line
ofnew systems (Saluki, Wuno, Paneki)